KENNEDY SPACE CENTER, FL – NASA completed a fully successful cryogenic fueling test and simulated launch countdown test of its SLS (Space Launch System) mega moon rocket during the 2nd attempt at a wet dress rehearsal (WDR) on Thursday, Feb. 19 at the agency’s Kennedy Space Center in Florida. “Engineers loaded more than 700,000 gallons of liquid propellant into the rocket, sent a closeout
KENNEDY SPACE CENTER/CAPE CANAVERAL, FL – As part of the ongoing investigation into why significant levels of gaseous hydrogen were detected during the recent WDR wet dress rehearsal cryogenic propellant loading test on Feb. 2 – that forced NASA to abort the final steps of the test – the agency conducted an unannounced liquid hydrogen (LH2) partial fueling test of
KENNEDY SPACE CENTER/TITUSVILLE/CAPE CANAVERAL, FL – We had a few opportunities to photograph NASA’s Artemis II moon rocket from locations on the Kennedy Space Center as well as off site from Titusville along the Indian River lagoon – as the 2-day long Wet Dress Rehearsal (WDR) cryogenic fueling and simulated countdown was in progress since the evening of Jan. 31.
KENNEDY SPACE CENTER, FL – I was interviewed live by FOX 35 Orlando on Feb. 3 at the Kennedy Space Center press site following NASA’s news conference for the media discussing why the WDR (wet dress rehearsal) cryogenic propellant fueling test for the Artemis II moon rocket ended early overnight Feb 2/3 due to serious hydrogen leaks. Also- what’s ahead
KENNEDY SPACE CENTER, FL – The first WDR (wet dress rehearsal) cryogenic propellant fueling test for the Artemis II moon rocket ended early overnight Feb. 2/3 when it was halted due to serious hydrogen leaks that plagued the test at multiple points throughout the day and evening. NASA is now working to fix the hydrogen leaks which reached a dangerous
KENNEDY SPACE CENTER/CAPE CANAVERAL, FL – I was interviewed live by WESH 2 NBC News Orlando on Jan. 30 for my comments and analysis update explaining two NASA human spaceflight missions – namely NASAs Artemis II human lunar flyby status on Artemis II despite the cold Florida weather and the NASA SpaceX Crew-12 launch status to ISS. WESH 2’s Michelle Imperato and Stewart Moore
KENNEDY SPACE CENTER PRESS SITE, FL – NASA’s Artemis II SLS Orion rocket destined to carry the first humans to the Moon on a history making mission as soon as early February was rolled out to launchpad 39B on 17 Jan 2026 over 12 hours stretching from dawn to dusk The rollout of the 11-million-pound Artemis II SLS/Orion rocket integrated
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA decided the 4th Wet Dress Rehearsal (WDR) Tanking Test conducted on the repaired 32- story tall Space Launch System (SLS) rocket on Monday, June 20 was sufficiently successful to declare completion of the practice countdown and cryogenic fueling test campaign objectives despite a new hydrogen leak – and thereby paves the
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – For the first time NASA was able to fully fuel both stages of the agency’s Mega Moon Rocket with supercold cryogenic propellants and enter the terminal countdown to within 29 seconds of T-Zero on Monday June 20, despite a hydrogen leak during the fourth attempt to complete the critical countdown and
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – With the seasons 1st tropical storm on the way towards Florida right at the open of Hurricane season technicians final preparations are in progress to roll NASA’s now repaired Artemis 1 Moon rocket out from the Vehicle Assembly Building (VAB) to launch pad 39B at NASA’s Kennedy Space Center, just past

