For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Just in the nick of time from approaching thunder and rainstorms NASA’s 32- story tall Space Launch System (SLS) rocket was transported back from Launch Complex-39B and arrived inside the Vehicle Assembly Building (VAB) NASA’s Kennedy Space Center (KSC) on Saturday afternoon, July 2, after agency officials determined that the
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA decided the 4th Wet Dress Rehearsal (WDR) Tanking Test conducted on the repaired 32- story tall Space Launch System (SLS) rocket on Monday, June 20 was sufficiently successful to declare completion of the practice countdown and cryogenic fueling test campaign objectives despite a new hydrogen leak – and thereby paves the
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – For the first time NASA was able to fully fuel both stages of the agency’s Mega Moon Rocket with supercold cryogenic propellants and enter the terminal countdown to within 29 seconds of T-Zero on Monday June 20, despite a hydrogen leak during the fourth attempt to complete the critical countdown and
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – The practice countdown has begun for the fourth attempt by NASA to complete the critical countdown and tanking test – known as the Wet Dress Rehearsal (WDR) – for the now repaired SLS Artemis 1 Moon rocket standing vertical at launch pad 39B at NASA’s Kennedy Space Center in Florida. The
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Repairs are in progress on NASA’s first ever Space Launch System (SLS) Mega Moon rocket and ground systems required to carry out the next attempt at the critical countdown and fueling test – known as the Wet Dress Rehearsal (WDR) – after the 32 story tall stack rolled off the launch
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Enjoy our gallery of up close photos of NASA’s first ever Space Launch System (SLS) Mega Moon rocket taken at Launch Complex 39B a few days ago at NASA’s Kennedy Space Center (KSC) before it rolls back to the Vehicle Assembly Building (VAB) for repairs to the rocket and ground systems
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER/CANAVERAL NATIONAL SEASHORE, FL – NASA has started the critical countdown and fueling test known as the Wet Dress Rehearsal (WDR) on April 1 as planned for the first ever Space Launch System (SLS) Mega Moon rocket rolled out to its launchpad atop the Mobile Launcher at the Kennedy Space Center (KSC) in Florida
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Following a lengthy investigation and swap out of the engine controller unit on RS-25 engine number four that is integrated at the base of NASA’s first Space Launch System (SLS) rocket core stage for the Artemis 1 Moon, mission engineers have determined that a faulty memory chip is to blame for
For SpaceUpClose.com & RocketSTEM CAPE CANAVERAL, FL – Former 3 term U.S. Senator Bill Nelson (D) from Florida and veteran space flyer was sworn in today, May 3, as the 14th NASA Administrator by Vice President Kamala Harris after he was unanimously confirmed by the U.S. Senate last week following his formal nomination for the prestigious post by President Joe
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA has selected Elon Musk’s SpaceX to develop the next US human lander system (HLS) to carry out the agency’s goal of landing the next Americans astronauts on the South Pole of the Moon as soon as late 2024 under Project Artemis – they would be the first humans walking on

