Tag: SLS

Last Look at NASA Artemis 1 Moon Rocket Before Hurricane Nicole Forced Launch Delay to Nov. 16: Photos

For SpaceUpClose.com & RocketSTEM PLAYALINDA BEACH/KENNEDY SPACE CENTER, FL – Here’s a last look at NASA’s Artemis 1 Moon rocket standing vertical at launch pad 39B at NASA’s Kennedy Space Center in Florida on Monday, Nov. 7, just prior to the impending landfall of Hurricane Nicole on Florida’s East Coast tracking for overnight Thursday, Nov. 10 and consequently face hurricane

Artemis 1 Moved to VAB Protective Hangar at Kennedy due to Hurricane Ian: Photos

For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – In the face of the impending devastating threat from monster Hurricane Ian approaching the Florida peninsula including the Space Coast NASA technicians successfully moved the Artemis 1 Moon rocket back to inside the Vehicle Assembly Building (VAB) protective hangar Tuesday morning, Sept. 27, after starting the 4-mile trip from atop launch

Last Look at Artemis 1 atop Launch Pad 39B Before Rollback to VAB Shelter due to Hurricane Ian: Photos

For SpaceUpClose.com & RocketSTEM PLAYALINDA BEACH/KENNEDY SPACE CENTER, FL – Due to the impending threat from monster Hurricane Ian approaching the Florida peninsula including the Space Coast NASA officials have decided to roll the Artemis I Space Launch System (SLS) rocket and Orion spacecraft back to the Vehicle Assembly Building (VAB) protective shelter on late Monday evening, Sept. 26. “NASA

NASA Successfully Completes Critical Cryogenic Tanking Test for Artemis 1 Moon Rocket: Photos

For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA successfully completed the critical cryogenic tanking test for the Artemis 1 Moon rocket on Wednesday, Sept. 21, after teams encountered another significant hydrogen leak near the start of the loading process engineers and then effectively resolved them in a timely manner at Launch Complex 39B at the Kennedy Space Center

NASA Delays SLS Cryogenic Tanking Test to Sept. 21 and Artemis 1 Moon Rocket Launch to NET Late September: Photos

For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA says technicians have completed repairs to the leaking hydrogen fuel line on the mammoth Artemis 1 Moon rocket out at launch pad 39B which in turn will allow the team to move forward and carry out a full tanking demonstration test of super cold cryogenics to verify whether the dangerous

NASA Artemis 1 Moon Rocket and Record Setting SpaceX Falcon 9 Rocket Duo Simultaneously Vertical at KSC Launch Complex 39 after SLS Scrub: Photos

For SpaceUpClose.com & RocketSTEM CANAVERAL NATIONAL SEASHORE/KENNEDY SPACE CENTER, FL – For a brief day in early September a darling rocket duo were standing simultaneously vertical at the sister pads Launch Pads 39B and 39A at the Kennedy Space Center (KSC) in Florida – namely NASA’s Artemis 1 maiden SLS/Orion Mega Moon rocket and SpaceX’s record-breaking recycled Falcon 9 rocket