For SpaceUpClose.com & RocketSTEM TITUSVILLE, FL – Following five consecutive weather scrubs since Tuesday, Sept. 13, the heavens miraculously cleared just enough despite another poor forecast and SpaceX at last launched a veteran Falcon 9 rocket on the sixth try just past sunset Sunday evening, Sept. 18, on a mission carrying another batch of Starlink internet satellites to low Earth
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA says technicians have completed repairs to the leaking hydrogen fuel line on the mammoth Artemis 1 Moon rocket out at launch pad 39B which in turn will allow the team to move forward and carry out a full tanking demonstration test of super cold cryogenics to verify whether the dangerous
For SpaceUpClose.com & RocketSTEM CANAVERAL NATIONAL SEASHORE/KENNEDY SPACE CENTER, FL – For a brief day in early September a darling rocket duo were standing simultaneously vertical at the sister pads Launch Pads 39B and 39A at the Kennedy Space Center (KSC) in Florida – namely NASA’s Artemis 1 maiden SLS/Orion Mega Moon rocket and SpaceX’s record-breaking recycled Falcon 9 rocket
KENNEDY SPACE CENTER, FL – NASA announced that technicians are repairing the leaking hydrogen fuel line on the mammoth Artemis 1 Moon rocket out at launch pad 39B which in turn will enable the team to carry out a full tanking demonstration test of super cold cryogenics to verify whether the dangerous leak has been fixed out at the pad
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – A significant hydrogen fuel leak discovered in a quick disconnect fitting near the beginning of loading of cryogenic propellants forced NASA to scrub the 2nd attempt to launch the Artemis 1 Moon rocket in five days on a lunar test flight mission scheduled for Saturday, Sept. 3 from the Kennedy Space
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Following the scrub called on the first launch attempt of the Artemis 1 Moon rocket on Monday, Aug 29, NASA officials have decided to postpone the launch date for the maiden flight of the mammoth SLS Mega Moon rocket on its unpiloted lunar test flight from NASA’s Kennedy Space Center (KSC)
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA announced the agency has moved up the rollout of the Artemis 1 Moon rocket from the iconic Vehicle Assembly Building (VAB) to its launch pad by nearly 2 days to Tuesday, Aug. 16 and is still targeting Aug. 29 as the launch date for the maiden flight of the mammoth
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA announced the agency is tentatively targeting August 29 as the launch date for the maiden flight of the mammoth SLS Mega Moon rocket on the Artemis 1 unpiloted lunar test flight from NASA’s Kennedy Space Center (KSC). NASA officials determined that the 4th Wet Dress Rehearsal (WDR) Tanking Test conducted
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – Just in the nick of time from approaching thunder and rainstorms NASA’s 32- story tall Space Launch System (SLS) rocket was transported back from Launch Complex-39B and arrived inside the Vehicle Assembly Building (VAB) NASA’s Kennedy Space Center (KSC) on Saturday afternoon, July 2, after agency officials determined that the
For SpaceUpClose.com & RocketSTEM KENNEDY SPACE CENTER, FL – NASA decided the 4th Wet Dress Rehearsal (WDR) Tanking Test conducted on the repaired 32- story tall Space Launch System (SLS) rocket on Monday, June 20 was sufficiently successful to declare completion of the practice countdown and cryogenic fueling test campaign objectives despite a new hydrogen leak – and thereby paves the

